• Home
  • About
  • Services
  • Projects
    • LRT1
    • MRT3
    • PNR
    • Building Construction
  • Tools & Equipment
    • Tools
    • Equipment
  • Contact
  • Jobs

Contruction of 2-lines x 510 linear meter Overhead Catenary System(OCS) for test Tracks 2 and 3 of Stabling Area, MRT-3 Depot

Project Description:

Suppy and Installation of Overhead Catenary System (OCS) which include wiring & fixing of Messenger wires, contact wires, jumper wires and cantilever brackets. It is also include the testing and commissioning of OCS and Test trains.

 

CSS Valid | XHTML Valid | Top
Copyright © Joratech Corporation - MIS TEAM 2023 All rights reserved. Custom Design by Youjoomla.com
MRT3