Project Description:
Systematic Rail Replacement that includes Hauling and Transportation of rails from depot to mainline,dismantling of old rails and hauling from mainline to depot, Installation of new rails including thermit welding works, rail grinding , ultrasonic testing or rail welds and fixing of rail fastenings. Tracks Geomentry correction that include ballast tamping, rail lifting & lining. Replacement of Pulverized ballast that include hauling and installation of new G2 ballast, Replacement of checkrail and Track Geometry Measurement.