• Home
  • About
  • Services
  • Projects
    • LRT1
    • MRT3
    • PNR
    • Building Construction
  • Tools & Equipment
    • Tools
    • Equipment
  • Contact
  • Jobs

Installation of Cable Duct Covers at the Mainline from South Reversing Tracks to Monumento Terminal

Project Description:


Transfer and arrage the conrete Cable Duct Cover from South Bound tp North Bound
Baclaran to Monumento. Including Cutting and Installation of Special Duct Cover to fix the existing
OCS Pipes and Poles.

CSS Valid | XHTML Valid | Top
Copyright © Joratech Corporation - MIS TEAM 2023 All rights reserved. Custom Design by Youjoomla.com
LRT1